As I'm writing this post the last session of St Paul Pass I itself is history. Only 7 attendants (one of them late) appeared and that made it a very relaxed (some say too relaxed) session. The last time there were fewer than 8 participants was in December 2008! Due to the fact that only 2 through trains each way were running it was not too compelling for the dispatcher as there was a gap of 12 fast hours between them.
However, it is known that for a good session we need at least 10 people.
Since there will be a longer pause until the next session and for the first few sessions a large crowd won't be needed, this is not really a problem anymore.
Here are a few pics my son Florian and I made during the session:
This is the last track cleaning train at the beginning of the session. I use the CR and 2 SP units that don't see use in many trains. Here CR 6338 will soon be splitting the signals at Kyle West switch.
A little while later we see it somewhere between Kyle and Adair
and finally approaching Avery....
This small sawmill is a masterpiece from my son Florian (that was before he found out that there are girls out there...) It will be saved and get a fine place on the new layout.
The 936/937 job to Ethelton is seen here (at least the tail end) - in the background we have the gas tube ...oh my... it's in the way of level 3. I forgot it completely when planning the St Paul Pass II! Fortunately, the track will fit under it. It's not beautiful, but there is no way removing it...
East Portal West switch is on the upper level and Hobo Ridge on the lower one. The name comes from the hobo camp at it's base.
Adair and the cement mill.
Marmoraton Mining Limestone Works will be saved, too. It already has a place on my plan (level 1).
Marble Creek will not be a junction any more. This is the last #925 moving out of the tunnel. On the left are the first two towers of Kelly Creek trestle which will also find a home on the new layout. The white spot on the right is the hole I battered out of the gypsum mountain to find two missing locos. (Long story)
The other half of Kelly Creek trestle. I thought it was a good idea to separate the levels with a 2-turn helix. As it turned out this was not the case. 45 cm ( 17") radius combined with a more than 3% grade is taxing all locos to the extreme. Sometimes even 4 6axle SD40-2 are not enough. This is a part of StPP I that would have been changing anyway.
Here is a detail shot of the lumber cabin, made by my son Florian (before, you know...), complete with interior, for example a stove, beds and drawer.
This is Mr. Lumberjack himself, sitting on his bed. In the background there is his nice lamp.
The last through train.....
Little Joe #22 waits for an assignment.
The area of the roundhouse with a few helpers waiting for trains that won't be coming any more....
The ready track with an NW2, SD40 and U23B
The wrecking track. The wrecking train will be moved to St Maries (where it belongs).
Wolfgang as an eager-to-learn Yardmaster has done a very good job to keep the yard clean...
SD40-2 #157 (with long hood forward!) arrives at Avery. The helper is uncoupled (just now - as you can see the 0-5-0 in the back) and will soon find an empty track at the roundhouse.
#932 in Calder. Seems that stealth NW fans are among us as we have a long hood again!
The next signal shows red-over-red, which is quite correct....
Mr Hobo and his friend are chatting. They sure hope that Sherrif Smith won't be coming along..
Yes, the Milwaukee even has modern concrete ties laid down....
The US Forest Service loading track.
The overpass at Calder which leads to the USFS track.
Yellow over red at East Portal
..the end of the line for now.